First Sill Off
The first sill (offside) has now been removed, along with the offside wing. Now we can begin to see the scale of work required to rebuild. We definately need to replace the inner sills. The lower section of the read quarter looks pretty bad too and will need some panel repairs. But at least the offside A post looks reasonable and should be able to work with it.
The front inner sill has had a bad replacement pane hammered into shape here. This’ll need work.